TSI#008 - Dimping Ribs 3 and 2

To better fit the skin of the parachute cover, ribs 3 and 2 need to have a bunch of holes dimpled. For dimpling we use the DRDT-2 from ExperimentalAero. We dimpled the parts prior to cleaning and priming to have a better fitting of the primer. After some more cleaning and priming, the parts came together quite nicley. We did not have any issues with rib 3 but with rib 2 as the construction manual shows 4x 3....

November 2, 2023 · 1 min · 127 words · Jan Gilla

TSI#007 - Ribs Ribs Ribs...

During the last days, we took quite some time to prepare, prime and rivet the next bunch of ribs. Starting with rib 6 which includes some parts sliding through a slot of other parts. Besides the construction manual only showing 7 rivets to connect the parts 1 and 4 after sliding the parts together, we shot rivets in all 9 holes. The next step would be to combine the first set of ribs together....

October 30, 2023 · 1 min · 159 words · Jan Gilla

TSI#006 - First Rivets

Today, I took the time to clean, prime and cleco the first two ribs together. As the parts for rib 9 are still on backorder, I started with ribs 8 and 7. I use 3M Scotch-Brite Pads (red) to prepare the surface for priming. Once the surface is a brushed, I use Aceton to clean of any grease traces. As soon as the parts are dry and the Aceton is vaporized, I apply FINIXA Etch Primer to the parts....

October 24, 2023 · 1 min · 138 words · Jan Gilla

TSI#005 - First Kits arrived in Germany

Today, I recieved a call from a forwarding agency from the Netherlands. The truck driver told me on the phone that he had unloaded the two packages and placed them besides my garage. I was a bit confused, as I didn’t even know that the parcels were handed over to a shipping company in the Netherlands. The next step is checking the delivery against the packing lists and checking all parts arrived in a safe manner!...

October 16, 2023 · 1 min · 76 words · Jan Gilla

TSI#004 - LBA callsign D-ETSI reserved, shipment loaded onto ship

Today, I recieved a letter from the Luftfahrt Bundesamt confirming the reservation of my desired callsign. In accordance with the application, we have reserved the following registration number “D-ETSI” for your sample “Sling TSi-JG”. The reservation is valid until 16.08.2024. In addition to that, the loading of my first order onto the vessel is confirmend. Let’s see how long it takes for MSC Desiree to make it’s way from ZA to NL....

August 23, 2023 · 1 min · 72 words · Jan Gilla